The Proposed Upgrading Works to Bohol Detention Pond involved the enhancement of an existing flood mitigation facility to improve stormwater management capacity and long-term operational reliability. The project included the design, supply, installation, testing, and commissioning of mechanical and electrical systems supporting the upgraded detention pond infrastructure.
Cekap Air provided integrated engineering solutions covering electrical distribution, control systems, pump installations, instrumentation, and commissioning support to ensure efficient operation and compliance with project specifications.