Kuala Terengganu Utara Water Supply Scheme

Contract Value
RM 394,388,000
Client
Konsortium KAJV / SATU
Location
Kuala Terengganu, Malaysia
Scope
Design, Supply & Build

The Kuala Terengganu Utara Water Supply Scheme is one of the most significant water infrastructure projects in Terengganu, involving the full design, procurement, construction, and commissioning of a 120 MLD water treatment plant, multiple raw water intake pumping stations, and associated distribution infrastructure. Cekap Air delivered the full mechanical and electrical scope as part of the Konsortium KAJV/SATU, working under one of the most complex multi-package project structures in the region.

Key installations included the 120 MLD Pulau Bahagia raw water intake pumping station, the 48 MLD Pulau Musang intake, PCF membrane filter package plants, lamella clarifier systems, pressure filter tanks, chemical and chlorine dosing plants, and treated water pumping and distribution infrastructure.

  • Construction, testing and commissioning of 1 nos ground reservoir 4.5ML as clear water tank for Loji Rawatan Air Losong 44MLD, 2 nos elevated reservoir 4.5ML at Gong Badak and Loji Air Kepong 1. Major pipelaying work consist of DN600 MSCL, approximate 13km, DN700 MSCL pipework approximate 10km and DN900 MSCL pipework approximate 17km
  • Engineering, Construction, testing and commissioning of 44MLD raw water intake and package plant, construction of new treated water pumping station 90MLD at Loji Rawatan Air Kepong 1, Replace all TWP for Loji Air Kepong 2 160MLD. Work inclusive of engineering, procurement, construction and commissioning the above from civil and structural, mechanical, electrical and instrumentation
Contract Value

RM 394,388,000

Status
Completed
Completion date
9 July 2026
Client
Konsortium KAJV / SATU
Location
Kuala Terengganu, Malaysia